Staunton-on-Wye Primary School

This small Primary school in in West Herefordshire reflects the eco-friendly ethos of the school community. The Voluntary Aided School with 70 pupils in 3 classes, and a community run pre-school, has a very strong and existing ‘Eco Ethos’, where sustainability is at the heart of the teaching, learning and is well embedded within their curriculum.

The building design reflects the eco-friendly ethos of the school community, which was communicated through a successful consultation process and translated into a built form. The design process included an extensive consultation with staff, students and parents which arrived at a series of key points for inclusion in the brief:

  • A secure and welcoming entrance.

  • A simple plan allowing for passive surveillance of students.

  • A building section that maximises natural light while allowing natural ventilation.

  • Flexible and agile spaces.

  • Direct link to the outside from every classroom.

This project was completed as Project Architect and CEPH designer at Architype Architects on a Traditional Building Contract.

Status: Completed 2010

M&E Engineer: Ernest Griffiths

Structural Engineer: WSP

Contractor: Thomas Vale Construction (now Bouygues)

Previous
Previous

Parc Y Tywyn Primary School